Through energy transmission concessions, we operate in the management and maintenance of Basic Network assets that are part of the National Interconnected System (SIN), an extensive network that connects power generation to consumers — totaling 4,159 km of transmission lines and 34 substations, with an installed transformation capacity of 3,750 MVA, capable of supplying the equivalent of 400,000 households per hour.
In addition to our headquarters and the System Operation Center located in São Paulo, we are present in ten other Brazilian states — Bahia, Ceará, Maranhão, Minas Gerais, Goiás, Paraíba, Pernambuco, Piauí, Rio Grande do Norte, and Rondônia.
ARGO I
1.110km
of transmission lines
5
substations
RAP R$661 million
Annual Permitted Revenue
ARGO II
1
substation
RAP R$61 million
Annual Permitted Revenue
ARGO III
320km
of transmission lines
5
substations
RAP R$109 million
Annual Permitted Revenue
ARGO IV
313km
of transmission lines
2
substations
RAP R$95 million
Annual Permitted Revenue - 1 substation shared with Argo VIII
ARGO V
277km
of transmission lines
4
substations
RAP R$112 million
Annual Permitted Revenue - 1 substation shared with Argo VII
ARGO VI
490km
of transmission lines
7
substations
RAP R$108 million
Annual Permitted Revenue - 2 substations shared with Argo VIII
Argo VII
786km
of transmission lines
8
substations
RAP R$293 million
Annual Permitted Revenue - 1 substation shared with Argo V
ARGO VIII
427km
Transmission Lines
3
Substations
RAP R$176 million
Annual Permitted Revenue - 1 substation shared with Argo IV and 2 shared with Argo VI
ARGO IX
436km
of transmission lines
3
substations
RAP R$199 million
Annual Permitted Revenue - 1 substation shared with Argo IV and 2 shared with Argo VI